<tr id="i84i0"></tr>
    • 中文字幕欧美日韩,久操线在视频在线观看,亚洲一级色,国产精品露脸视频,在线a人片免费观看,国产自在线播放,亚洲欧洲AV一区二区三区,91国语精品3p在线观看

      phone/wechat/what's app: +86-18653810085

      Email: hongyuanmakela@163.com

      Taian Hongyuan Geosynthetics Co., Ltd.
      Tel:18653810085

      News Current Position:Home > News

      How to control the quality of geomembrane composite with non-woven?

      Release time:2020-4-7    This article is read :4126 Times

      geomembrane composite with non-woven

             How to control the quality of geomembrane composite with non-woven?.The quality of geomembrane composite with non-woven also needs to be controlled. As a professional geomembrane composite with non-woven manufacturer, Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the wholesale of geomembrane composite with non-woven for many years. The editor will take you to learn together.

             1. The geomembrane composite with non-woven with raw material quality control entering the site must have a certificate of conformity, performance and characteristic indicators and instructions for use provided by the manufacturer. Otherwise, it cannot be used for engineering construction. The two-fabric one-membrane needle-punched geomembrane composite with non-woven is used in this project. The technical parameters of the designed geomembrane composite with non-woven are: design weight 900g / m2, film thickness 0.5mm, vertical permeability coefficient ≤10-12cm / s. After the geomembrane composite with non-woven came into the field, the geomembrane composite with non-woven was randomly selected and its performance indexes were entrusted to the Nanjing Water Conservancy Research Institute Experimental Center for retesting, and the retesting results were all qualified.

             2. Control of the construction operation process Before the laying of the geomembrane composite with non-woven, the construction organization design should be compiled, the laying method and technical measures should be explained, and it should be used after being approved by the supervision. The construction personnel should wear flat-bottomed shoes or soft rubber-soled shoes. Step on the damaged geomembrane, so as to lay with the pressure, the laying of the geomembrane composite with non-woven should be coordinated with the laying of the protective layer. The quality of the geomembrane composite with non-woven welding seam in splicing is the key to splicing. In particular, the joint detection should be strengthened during construction. The detection method has a visual inspection method and two on-site leak detection. Visual method: After welding the geomembrane composite with non-woven, observe whether there is any missing joint, whether the joint is burnt, whether there is wrinkle, whether the splicing is even, etc. On-site leak detection adopts the inflation method to detect all the welds. The welds are double strips, with a cavity of about 10mm between the two. Seal both ends of the section to be tested, insert the gas needle, and inflate to 0.05mpa ~ 0.20 mpa, observe for 0.5min, observe the vacuum gauge, if there is no drop in air pressure, it shows no leakage, welding seam grid, otherwise you must find the cause and repair it in time. The anchoring of the upper and lower parts of the geomembrane composite with non-woven is an important link, and construction shall be carried out in strict accordance with the construction drawings and after acceptance by the supervisor.

             3. Quality inspection after construction. The quality inspection after construction is mainly a sampling test. A test piece is taken every 1000m2 for the tensile strength test. The strength should not be less than 80% of the base material, and the sample should not be broken at the joint, otherwise the joint quality will not be qualified. A total of about 45000m2 of geomembrane composite with non-woven was used in the whole project. A total of 43 sets of weld samples were taken on site for tensile strength test. The passing rate of the test was 100%, and the weld quality was qualified.

      How to control the quality of geomembrane composite with non-woven?
      Previous:How to deal with the boundary when laying the geomembrane composite with non-woven?next:Construction notes of GCL

      Contact Us:

      WeChat public account

      Taian Hongyuan Geosynthetics Co., Ltd.

      Phone / Wechat / What's app:+86-18653810085

      Telephone / Fax: + 86-538-6598877

      Email:  hongyuanmakela@163.com

      Website: www.51tianyue.com

      Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

      Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

      主站蜘蛛池模板: 干中文字幕| 在线免费无码视频| 日韩大片免费观看视频播放| 精品一区二区无码av| 国产精品亚洲日韩AⅤ在线观看| 欧美成a人片在线观看| 四虎精品国产永久在线观看| 无码中文AⅤ在线观看| 91伊人国产| 国产高清在线精品一区二区三区| 2021国产乱人伦在线播放| www.狠狠| 国产精品理论片| 无码精品福利一区二区三区| 成人免费视频一区二区三区| 88av在线看| 国产精品手机在线播放| 凹凸国产熟女精品视频| 久久黄色一级视频| 亚洲成人网在线播放| 国产日韩精品欧美一区灰| 十八禁美女裸体网站| 亚洲精品国产综合99| 亚洲动漫h| 久久免费视频播放| 成人毛片免费在线观看| 伊人AV天堂| 91精品视频网站| 99久久精品免费观看国产| 国产成人亚洲精品无码电影| 亚洲中文制服丝袜欧美精品| 天天操天天噜| 亚洲国产一区在线观看| 国产精品性| 成色7777精品在线| 午夜国产理论| 欧美成人精品一级在线观看| 亚洲AⅤ永久无码精品毛片| 欧美精品亚洲精品日韩专区| 激情在线网| 国产视频一二三区| 国产精品自在在线午夜| 精久久久久无码区中文字幕| 日本黄色不卡视频| 精品国产欧美精品v| 欧美日韩国产精品va| 亚洲开心婷婷中文字幕| 日本www在线视频| 亚洲大尺度在线| 午夜欧美理论2019理论| a网站在线观看| 日韩区欧美国产区在线观看| 欧美日本在线观看| 老司机久久99久久精品播放 | 亚洲欧美人成人让影院| 亚洲Av综合日韩精品久久久| 草逼视频国产| 日本亚洲成高清一区二区三区| 国产午夜无码专区喷水| 国产人人射| 亚洲成aⅴ人片在线影院八| 国产精品永久不卡免费视频| 国产91熟女高潮一区二区| 色综合狠狠操| 五月天久久综合| 人妻熟妇日韩AV在线播放| 亚洲系列无码专区偷窥无码| 伊人激情综合网| 在线色国产| 丰满人妻中出白浆| 免费aa毛片| 国产精品久久久久久久伊一| 四虎AV麻豆| 亚洲国产成人精品青青草原| 大香伊人久久| 色妞永久免费视频| 97成人在线视频| 精品撒尿视频一区二区三区| 丁香亚洲综合五月天婷婷| 综合色天天| 精品无码日韩国产不卡av| 亚洲AV永久无码精品古装片|