      Construction steps of geomembrane composite with non-woven

      Release time:2020-4-7    This article is read :6079 Times

      Taking the construction of geomembrane composite with non-woven in Huyan tank as an example, it is divided into several steps, such as clearing the foundation, laying the underlying layer, laying the geomembrane composite with non-woven and welding, and covering the protective layer. Construction steps of geomembrane composite with non-woven

      1. Clean the base surface of the pool slope

      Before laying the geomembrane composite with non-woven, the ribbed hard objects that may damage the geomembrane composite with non-woven on the base surface of the pool slope should be removed, the pits should be filled, and the slope surface should be treated according to the requirements. The slope flatness and compaction must meet the design requirements. Only then can the underlying layer of the geomembrane composite with non-woven be laid.

      2. Laying of the underlayer

      The underlayment of geomembrane composite with non-woven in Huyan reservoir is a coarse sand underlay with a thickness of 20cm. When laying the sand cushion layer, use long-arm backhoe and belt conveyor to feed the ice-cutting platform foundation and the pool bottom to the slope surface respectively, use the shovel to pave it flatly, and then sprinkle water to compact it. The relative density of the sand cushion layer after compaction meets the design requirements The geomembrane composite with non-woven can be laid later.

      3. Welding test of geomembrane composite with non-woven

      The joint of the geomembrane composite with non-woven should be tested on site to determine the parameters such as welding temperature, walking speed of the welding machine, temperature adjustment coefficient, etc. The site construction can be carried out after the test results are approved.

      4. Laying of geomembrane composite with non-woven

      The laying of geomembrane composite with non-woven consists of four processes: paving → bonding of the bottom geotextile → geomembrane welding → welding quality inspection → surface geotextile stitching

      4.1 Visual inspection before paving of geomembrane composite with non-woven

      The geomembrane composite with non-woven should be inspected for its appearance quality before paving. The geomembrane is not allowed to have trachoma, defects and impurities, and record and repair the mechanical damage and other defects that occur, and replace it seriously.

      4.2 Laying method of geomembrane composite with non-woven

      The laying of geomembrane composite with non-woven is divided into two parts: pool slope laying and pool bottom laying. When laying, the construction should be carried out in a weather with a temperature above 5 ° C, a wind force below 4 and no rain or snow, in accordance with the order of the pipeline operation, and manual laying is adopted. Laying method: After passing the acceptance check, the pool slope rolls from top to bottom and connects with the geomembrane composite with non-woven at the bottom of the pool using a T-shaped connection. In order to ensure the overall quality of the waterproof layer, avoid the formation of cross seams. During the laying process, the operator should wear flat-bottomed shoes or soft rubber shoes. The machine should not crush the geomembrane and its protective layer. If the geomembrane is damaged during construction, it should be repaired in time.

      4.3 Problems to be noted in welding

      The bottom geotextile of the geomembrane composite with non-woven is bonded with a hot air welding gun, and the geomembrane is welded by the hot melt welding method. In order to ensure the welding quality, the welding should be carried out in the factory as much as possible. It must be spliced at the construction site, the construction quality of the splicing site must be well controlled, and on-site inspection and careful inspection should be done. After the welding of the geomembrane is completed, the top layer geotextile is sutured after passing the inspection. The top layer geotextile is sutured by a portable sewing machine and sutured by Nylon thread. At the joint of the geomembrane, pay attention that the membrane above the slope on the same section should be pressed above the membrane below.

      4.4 Overlay protective layer

      The protective layer overlying the Huyan reservoir is composed of sand cushion, graded crushed stone and concrete prefabricated blocks, with thicknesses of 20cm, 30cm and 15cm, respectively. After welding the geomembrane composite with non-woven and passing the quality acceptance, the sand cushion layer, graded crushed stone and concrete prefabricated blocks should be laid in time to prevent its easy aging and other factors caused damage under ultraviolet irradiation.

      geomembrane composite with non-woven

      Construction steps of geomembrane composite with non-woven
      Previous:Precautions for GCL constructionnext:Construction notes of GCL

      Contact Us:

      WeChat public account

      Taian Hongyuan Geosynthetics Co., Ltd.

      Phone / Wechat / What's app:+86-18653810085

      Telephone / Fax: + 86-538-6598877

      Email:  hongyuanmakela@163.com

      Website: www.51tianyue.com

      Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

      Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

      主站蜘蛛池模板: 久久久久久国产精品mv| 强奷白丝美女在线观看| 久久一色本道亚洲| 任我操在线视频| 亚洲 欧美 中文 AⅤ在线视频| 亚洲黄色视频在线观看一区| 99这里精品| 免费高清自慰一区二区三区| 欧美日韩一区二区在线播放| 不卡的在线视频免费观看| www.91中文字幕| 国产三级毛片| 国产jizz| 欧美亚洲欧美区| 在线观看免费国产| 人人看人人鲁狠狠高清| 亚洲人在线| 中文无码影院| 国产肉感大码AV无码| 97se亚洲| 91外围女在线观看| 婷婷色在线视频| 日韩欧美中文亚洲高清在线| 国产av一码二码三码无码| 日韩av无码DVD| 欧美日在线观看| 国产欧美专区在线观看| 久久人妻xunleige无码| 黄色不卡视频| 最新午夜男女福利片视频| 久久伊人操| 9啪在线视频| 国产精品亚洲专区一区| 一级成人a做片免费| 欧美中出一区二区| 91蜜芽尤物福利在线观看| 亚洲 日韩 激情 无码 中出| 中文字幕无线码一区| 亚洲欧美日韩动漫| 国产毛片网站| 天堂成人在线视频| 国产小视频网站| 欧美午夜一区| 99这里只有精品6| 97人妻精品专区久久久久| 亚洲免费福利视频| 国产成人综合日韩精品无码首页| 伊人久久福利中文字幕| 国产精品美女自慰喷水| 九九九精品成人免费视频7| 日日拍夜夜嗷嗷叫国产| 欧美成人a∨视频免费观看| 亚洲欧美激情小说另类| 亚洲欧美一级一级a| 91精品综合| 亚洲精品无码高潮喷水A| 色悠久久久久久久综合网伊人| 老司机午夜精品网站在线观看 | 都市激情亚洲综合久久 | 极品私人尤物在线精品首页 | 国产69精品久久久久孕妇大杂乱 | 天堂成人在线视频| 欧美日韩亚洲国产| 国产免费人成视频网| 精品国产99久久| 8090成人午夜精品| 国产 在线视频无码| 欧美在线伊人| a级毛片在线免费| 亚洲日韩精品无码专区| h网址在线观看| 58av国产精品| 久久国产拍爱| 欧美成人在线免费| 高清无码手机在线观看| 精品精品国产高清A毛片| 欧美综合一区二区三区| 无码aⅴ精品一区二区三区| 在线观看国产网址你懂的| 日本在线视频免费| 免费啪啪网址| 国产日韩精品一区在线不卡|